Chuquicamata open-pit copper mine, Chile

Metals & Mining

Concentrate,cathode,oxide,magnet:weownthetransfersinbetween

Non-ferrous metals, battery units and the rare-earth chain that every electrified supply chain depends on and almost nobody is willing to underwrite. We take the assay risk, the freight risk and the credit risk.

6
Metal books
In-house
Assay protocol
Mine→magnet
Chain traced
CopperAluminiumZincNickelLithiumNeodymiumPraseodymiumCopperAluminiumZincNickelLithiumNeodymiumPraseodymium
LME copper10,690.31USD/t 0.26%/
LME aluminium2,811.81USD/t 0.06%/
LME nickel(ind.)17,058.45USD/t 0.20%/
LME zinc(ind.)2,910.47USD/t 1.06%/
Cobalt standard grade(ind.)18.00USD/lb 1.01%/
NdPr oxide(ind.)90.55USD/kg 1.51%/
Lithium carbonate CIF(ind.)11,425.84USD/t 1.15%/
Gold spot2,610.22USD/oz 0.05%/
LME copper10,690.31USD/t 0.26%/
LME aluminium2,811.81USD/t 0.06%/
LME nickel(ind.)17,058.45USD/t 0.20%/
LME zinc(ind.)2,910.47USD/t 1.06%/
Cobalt standard grade(ind.)18.00USD/lb 1.01%/
NdPr oxide(ind.)90.55USD/kg 1.51%/
Lithium carbonate CIF(ind.)11,425.84USD/t 1.15%/
Gold spot2,610.22USD/oz 0.05%/
Market snapshot · live where listed

The books

Thedesks,andwhatweactuallysign

Form, pricing basis, assay protocol and delivery terms – the four lines that decide whether a metals trade makes money or makes a dispute.

CU

Copper & Concentrates

Grade A cathode into European wire rod and tube mills, plus concentrate cargoes placed against smelter capacity where treatment terms actually clear.

Product form
Cathode (LME Grade A), blister, concentrate 22–28% Cu
Pricing basis
LME cash settlement plus premium; TC/RC on concentrate
Quality & assay
Independent assay, umpire clause, moisture and penalty elements (As, Bi, Sb)
Delivery terms
CIF Rotterdam / Antwerp, DAP mill, FCA warehouse
  • LME warrant and off-warrant inventory financed on our balance sheet
  • Concentrate blending to smelter penalty limits
  • Back-to-back hedging on LME with daily mark-to-market
  • Container and breakbulk logistics with cargo insurance in place

Critical metals

Fromrocktomagnet

Separation capacity is concentrated in a single jurisdiction. Every stage of the alternative chain needs a buyer willing to commit before the plant exists. That is the trade.

01

Mine & concentrate

Bastnäsite and monazite feed from Africa, Brazil, Australia and Scandinavia, upgraded to 45–60% REO concentrate at site.

02

Crack & leach

Concentrate converted to mixed rare-earth carbonate – the point at which radionuclides are cleared and the cargo becomes shippable.

03

Separate

Solvent extraction into individual oxides. Ninety percent of the world's capacity sits in one country; funding the alternative is the trade.

04

Metal & alloy

Oxide reduced to metal and strip-cast into NdFeB alloy for the magnet plant, with purity certified at each transfer.

05

Magnet & recycle

Sintered magnet into motors, turbines and defence systems – and swarf and end-of-life units routed back into the same chain.

Market view

Thecurveswepriceagainst

LME copper

10,690.31USD/t

90d high
10690.31
90d low
9403.78
Session
+0.26%

Indicative curves for illustration – not an offer, quote or benchmark

Risk & governance

Wheremetalstradesgowrong

Assay is the contract

Weight, moisture and grade decide who was right. Independent sampling at load and discharge, umpire assay named up front, penalty elements priced before the vessel is fixed.

Basis risk is not price risk

LME flat price is the easy part. Premium, payability, treatment charges and freight are each carried as their own position, with their own limit.

Origin that survives an audit

Mine-to-mill chain of custody, conflict-minerals screening and sanctions clearance filed before the first payment leaves. Critical metals attract scrutiny; we invite it.

Separated rare-earth oxide powders in laboratory dishes

Why us

Units,notnarratives

Critical-metals markets are full of announcements. We contract tonnes, pay against documents, and take the position on our own balance sheet. If a chain cannot be documented from mine to oxide, we do not trade it – and we say so early.

06

Mine to magnet

Wherethetonnechangeshands

Mining haul truck at the pit
01

At the mine gate

01

At the mine gate

Offtake and prepayment agreed with the operator, with assay protocol and stressed pricing fixed before a single tonne moves.

Ore processing plant
02

Concentrate on the water

02

Concentrate on the water

Bagged or bulk concentrate shipped under our own logistics, sampled at load and discharge by an umpire we both accept.

Rare-earth oxides in a laboratory
03

Separation and oxide

03

Separation and oxide

The rare-earth chain documented step by step – nobody signs a magnet contract on a chain that cannot be traced.

Copper cathode stacked in a port yard
04

Metal against credit

04

Metal against credit

Warehouse receipt, insurance and title move together, so our capital and the metal are never in different places.

Sendustheassay,thetonnageandtheincoterm.

Contact the metals desk